As Hurricane Irene blew through Philadelphia last weekend, PWD's water and sewer infrastructure was put to the test. How did we do? Our infrastructure was designed to manage hurricanes and, with notable exceptions in very low-lying areas, the water was kept where it belonged. Even in Manayunk, where the floodwaters inundated Main Street, well-prepared citizens minimized the damage as much as possible.
Maybe it's not really a report card if you're grading yourself, but here’s how PWD stacked up by the numbers:
- PWD wastewater treatment plants received almost 1 billion gallons of stormwater, more than twice their normal volume, and maintained performance.
- PWD cleared 400 inlets in proactive preparation for Irene, and that number—along with the help of citizens—is, according to Mayor Nutter, "a great part of why we didn't have as much flooding as we could have possibly had."
- More than 55 PWD employees worked over the weekend to answer calls and pump out flooded basements.
- The Schuylkill and Delaware rivers crested at 13.5 ft. and 9.77 ft., respectively, in Philadelphia.
Philadelphia held up well overall but with saturated ground, trees did fall, electricity went out, and basements did flood. If you’re cleaning up, you’re not alone. After the jump, some tips to help with flooded basements.