NOTICE: PhillyWatersheds.org has been archived.

The archive will be available at http://archive.phillywatersheds.org for approximately one year (through September 2020). If you use or are responsible for content here that is not yet available elsewhere, please contact the PWD Digital Team.

Smith Playground

  • strict warning: Non-static method view::load() should not be called statically in /jet/app/www/default/sites/all/modules/views/views.module on line 906.
  • strict warning: Declaration of views_handler_argument::init() should be compatible with views_handler::init(&$view, $options) in /jet/app/www/default/sites/all/modules/views/handlers/views_handler_argument.inc on line 0.
  • strict warning: Declaration of views_handler_filter::options_validate() should be compatible with views_handler::options_validate($form, &$form_state) in /jet/app/www/default/sites/all/modules/views/handlers/views_handler_filter.inc on line 0.
  • strict warning: Declaration of views_handler_filter::options_submit() should be compatible with views_handler::options_submit($form, &$form_state) in /jet/app/www/default/sites/all/modules/views/handlers/views_handler_filter.inc on line 0.
  • strict warning: Declaration of views_handler_filter_node_status::operator_form() should be compatible with views_handler_filter::operator_form(&$form, &$form_state) in /jet/app/www/default/sites/all/modules/views/modules/node/views_handler_filter_node_status.inc on line 0.
  • strict warning: Non-static method view::load() should not be called statically in /jet/app/www/default/sites/all/modules/views/views.module on line 906.
  • strict warning: Declaration of views_plugin_style_default::options() should be compatible with views_object::options() in /jet/app/www/default/sites/all/modules/views/plugins/views_plugin_style_default.inc on line 0.
  • strict warning: Declaration of views_plugin_row::options_validate() should be compatible with views_plugin::options_validate(&$form, &$form_state) in /jet/app/www/default/sites/all/modules/views/plugins/views_plugin_row.inc on line 0.
  • strict warning: Declaration of views_plugin_row::options_submit() should be compatible with views_plugin::options_submit(&$form, &$form_state) in /jet/app/www/default/sites/all/modules/views/plugins/views_plugin_row.inc on line 0.

Paint Day at Smith Playground: Learn About Green Improvements and Send Connor Barwin a Message

Connor Barwin joined partners in South Philadelphia to announce major improvements at the Smith Recreation Center, including Green City, Clean Waters investments that will protect local waterways. Credit: PWD
Connor Barwin joined partners in South Philadelphia to announce major improvements at the Smith Recreation Center, including Green City, Clean Waters investments that will protect local waterways. Credit: PWD

While Philly is mourning the news that Eagles defensive end and super citizen Connor Barwin is headed to another team, his Make the World Better Foundation has pledged to continue its good work and is moving forward on projects the fan-favorite helped to fund.

One of those projects is the renovation of West Passyunk’s Smith Playground, a total overhaul being led by the community, Parks and Recreation, the nonprofit Urban Roots, City Councilman Kenyatta Johnson and SERVE Philadelphia.
Barwin helped raise $150,000 for the project and then matched that amount, just as he did when helping to fund improvements at the nearby Ralph Brooks Park in 2014.

Improvements at the 7.5-acre Smith Playground will include green upgrades that support the Philadelphia Water Department’s Green City, Clean Waters program and help to protect local waterways from stormwater pollution.
On top of getting new football and baseball fields, new green stormwater tools, and improvements for the rec center building and adjacent play spaces, this site will feature a Mural Arts installation by artists Kien Nguyen and Katie Yamasaki.

We Say Goodbye to 2015 (and a Green Champion) on Monday at Smith Playground

Mayor Michael Nutter speaks at the ribbon cutting for Ralph Brooks Park. Philadelphia Water will join Nutter for one last celebration of green infrastructure and community collaboration on Monday, December 28. Credit: Philadelphia Water.
Mayor Michael Nutter speaks at the ribbon cutting for Ralph Brooks Park in August. Philadelphia Water will join Nutter for one last celebration of green infrastructure and community collaboration on Monday, December 28. Credit: Philadelphia Water.

We’re joining Parks and Recreation and closing out 2015 with a ground breaking celebration for a big, very cool project: the revamp of Smith Playground at 24th and Jackson streets in South Philadelphia.

As the second playground project chosen by Urban Roots and the Make the World Better foundation, Smith Playground will get a full, $2.5 million makeover in the coming months. It follows in the footsteps of the popular Ralph Brooks Park project, where a similar collaboration led to a full renovation that wrapped up this summer.

Greening Smith: What We're Doing with Eagles' Connor Barwin

Connor Barwin of the Philadelphia Eagels speaks at the 2nd annual MTWB Foundation concert.
Connor Barwin of the Philadelphia Eagles speaks at the 2nd annual MTWB Foundation concert.

Philadelphia Water selected West Passyunk’s Smith Playground for Green City, Clean Waters improvements way back in 2012. While we were busy doing community outreach and design for the popular 7.5-acre recreation area, located at 25th Street and Snyder Avenue, we also happened to develop a great relationship with Connor Barwin of the Philadelphia Eagles and his Make the World Better Foundation (MTWB).

That led to our working together to rebuild the Ralph Brooks Park in nearby Point Breeze, which is currently under construction. When finished, the park will have new basketball courts, new play equipment, sidewalk improvements, tree plantings and a rain garden to manage stormwater runoff from the site.

It’s been such a hit, MTWB decided to bring the synergy that made Ralph Brooks Park a success to Smith, where we were already laying the ground for green stormwater improvements. Barwin held his second MTWB fundraising concert at Union Transfer in June, and generous giving resulted in $300,000 for Smith improvements. Tickets for the sold-out show made up over $150,000 of that, and Barwin matched the sales for the rest.

From MTWB:

Revitalization of South Philadelphia’s Smith Playground will provide major improvements to the 7.5-acre park including the Recreation Center building and adjacent play spaces, new football and baseball fields and the installation of Green Stormwater Infrastructure by the Philadelphia Water Department. Key partners on the project include Urban Roots, Philadelphia Parks and Recreation, City Councilman Kenyatta Johnson and Philly Rising.

So, what will our work bring to the Smith renovations? We’re contributing an estimated $500,000 to install four green stormwater tools at the site.
They include:

• A  basin beneath the soccer field at the southwest side of the park

• A basin beneath the sidewalk on the west side of the park

• A rain garden between the sidewalk and the basketball courts

• A rain garden on a paved area at the corner of 25th and Snyder

Besides enhancing the beauty of the site, these improvements will capture the equivalent of 2 SEPTA buses of water almost every time it rains—water that would otherwise be rushing into local sewers and waterways. The stormwater tools will mostly handle runoff coming from 25th Street, with a total of 1.66 acres of hard, impervious surface draining into the basins and rain gardens, where it will slowly filter into the earth and water table. That means less local flooding during rain events and healthier local waterways.

"I want to thank Union Transfer, the musicians and sponsors for another year of unwavering support," Barwin said after the concert. "Not only did we aim to put on an entertaining show for fans, but all proceeds will go towards transforming South Philly’s Smith Playground into a safe and enjoyable place for the community. I am humbled to live in a city that is filled with so many people who want to make their neighborhood, and the world, a better place to live, to grow and to learn."

We’re proud to be working with Barwin, MTWB, Urban Roots, Parks and Recreation and all the other partners, and we’re blown away at the generosity of everyone who contributed to make this public space better for all the West Passyunk residents who use the space and live near Smith.

Our green infrastructure construction at Smith is set to begin during summer 2016 and will take 4-6 months to complete, so stay tuned for more updates!

Syndicate content